ENGINEERING STANDARDS

Below are several standard drawings as provided by NTM in jpg and pdf formats. Please confirm that you have the latest version prior to submitting drawings for approval. The specifications and notes document is provided in pdf and doc formats.

Document Name
|
Format
Development and Construction  
Water and Sewer Availability
|
Tap Fees, Charges and Water Rates
|
Service Line Specifications
|
Developer Package
|
Standard Developer Notes
|
Utility Permit
|
Soil Amendment Specifications
|
SEWER  
S1 - Sanitary Service Connection
|
S2 - Manhole Detail
|
S3 - Inside Manhole Drop
|
S4 - Flat Top Manhole Lid
|
S5 - Sanitary Sewer Crossing
|
WATER
|
W1 - Trench Section
|
W2 - Poly Wrap
|
W3 - Kick Block
|
W4 - Gate Valve
|
W5 - Fire Hydrant
|
W6 - Service Line
|
W7 - Sampling Station
|
W8 - Unused
|
W9 - Unused
|
W10 - Restrained Length
|
W11 - Tracer Wire
|
W12 - Pipe Casing
|